Loi Hai 2 Wind Power Factory

Client

REE Corporation

Location

Loi Hai, Thuan Bac, Ninh Thuan Province

Scope of work

BOP General Contractor
28.9 MW/ Total cable length 4.3 Km

Time

Handed over in 6/2021

Loi Hai 2 Wind Power Factory

Vestas – Denmark provides all of the Factory’s wind turbine equipment, which meets European standards and ensures quality and long-term performance. The installation of the first wind turbine tower was accomplished with the maximum support of sophisticated technology and equipment, as well as the ability of engineers and workers on-site, ensuring the technical standards.

Project overview image