The project has been designed with a modern office building style, 2 basements, and 12 floors. It is conveniently located in the main street of Nguyen Van Troi – the entrance to the city center, which is very good for transportation. The project is estimated with a high level of complication. To make a fine preparation for it, the company’s BOD as well as SMB has offered some finest solutions, applying BIM for construction methods, shop-drawing, conflict inspection, and weight estimation. Besides, SMB has made an effective collaboration with plenty of departments, especially the Construction Engineering Dept to make sure safe construction within a city.