The project covers a total area of 28,262 m², of which 16,560 m² is allocated for fertilizer storage, designed to international standards, optimizing storage, operation, preservation, and distribution capabilities. The electrical system, lighting, security monitoring, fire safety, and ventilation systems are being synchronously invested in to ensure safety and maximum operational efficiency.
As the sole plant in Vietnam producing granular urea, the Ca Mau Fertilizer Plant supplies 860,000 tons of fertilizer to the market each year, playing a crucial role in ensuring the supply of high-quality fertilizers for domestic agriculture and exports, thus contributing positively to national food security goals.
As part of the value chain of the PetroVietnam Gas-Power-Fertilizer Group, along with the Ca Mau NPK Plant and the Korea-Vietnam NPK Plant, the supplemental warehouse project at the Ca Mau Fertilizer Plant not only enhances storage capacity but also increases flexibility in the coordination and distribution of products. This is a strategic step towards expanding the scale of PVCFC, raising the total fertilizer production capacity to nearly 1.5 million tons per year, thereby strengthening its leading position in the fertilizer industry in Vietnam.