Saigon Asiana Apartment

Located in a prime location in the administrative center of District 6, Saigon Asiana Apartment Project which Gotec Land Investor devoted wholeheartedly to bringing quality, unique and differentiated products. In this project, CENTRAL plays a role in structure, complete, and MEP. Before that, along with the engineering team, has offered some best solutions in technical and aesthetically estimated design and helped Investors save expenses as much as possible.

D-Homme Complex

The Project located in front of 765 Hong Bang Street, District 6, HCMC, which is the arterial road that connects Cho Lon Center and the Western Provinces.

Vinhomes Riverside The Harmony

At Vinhomes Riverside The Harmony (VRH), CENTRAL was the main contractor for the structural and finishing works. VRH is one of the key projects that Vingroup has invested in, VRH has been honored as the best complex in Asia-Pacific in 2012. So far, they have been continuously voted in the most worth living urban area in Vietnam. VRH Phase 2 inherits such outstanding facilities as convenient connectivity, eco-friendly space, 5-star amenities, and a civilized community. In addition to the low density of buildings, only 21% with 10.5 hectares of greenery and canal system over 6km, VRH also owns a central lake of 12.4 hectares.

Thao Dien Green

Thao Dien Green is a luxury apartment with 2 basements, 25 floors, located in a prime location, and has the best quality of life in the Thao Dien area up to now. The Project has a rather special shape and architectural design, requiring careful construction methods, such as 3-layer open and splash-proof basement, large block foundation pits. In addition, there is a transfer floor beam system located on the 2nd floor to create solidity for the building.

Vinhomes Smart City

Vinhomes Smart City is located on the axis of Thang Long Avenue – a prime location, where the intersection of a series of important roads, railways. Vinhomes Smart City aims to become a smart, modern city that is the focal point of every destination of the West of the capital. In this project, CENTRAL is the only General Contractor with the role of structural construction, finishing, and MEP. Three towers with 34 floors and 1 basement. Gangform formwork construction technology and Acotec wall panels are applied in construction.