PROCESS 3 PROJECTS IN THE CENTRAL

Project No.1: LOI HAI 2 WIND FARM 

Investor:REE CORP/ Thuan Binh Wind Power JSC.
Location:Loi Hai, Thuan Bac, Ninh Thuan Province
Capacity:28.9 MW/ Total Cable length 4.3 Km
BOP General Contractor:CENTRAL D&B
Supervision Consultant:Fichtner (Germany)
Turbine Supplier:Vestas Contractor (Denmark)
Total construction time:216 days
The actual picture of Loi Hai 2 Wind Farm and Phu Lac 2 Wind Farm
Total Layout Loi Hai 2 Wind Farm

Project No.2: PHU LAC 2 WIND FARM – PHASE 2

Investor:REE CORP/ Thuan Binh Wind Power JSC.
Location:Phu Lac, Tuy Phong, Binh Thuan Province
Capacity:26MW/ Total cable length 2.8 km
BOP General Contractor:CENTRAL D&B
Supervision Consultant:Fichtner (Germany)
Turbine Supplier:Vestas Contractor (Denmark)
Total construction time:228 days
Total Layout Phú Lạc 2 Wind Farm
Reference picture of wind turbine footing

Project No.3: VEGA CITY NHA TRANG

Investor:KDI Holdings
Location:Bai Tien, Duong De, Ward Vinh Hoa, Nha Trang City 
Scale:44 hectares
CFA:110.000 m2
Contract package:Main Contractor of Structure Package for Melia Hotel & New World Hotel
Including 1 basement + 8 Podium floors + 2 Tower 30 Floors
Supervision Consultant:Huyndai E&C
Total Construction time:393 days
Rerspective Vega City 44 hecta & Melia Hotel & New World Hotel

Link the article related to the project:

https://kdiholdings.com.vn/en/news/none-4/

Post related