DAYS OF CENTRAL’S LADIES

Outdoor activities combining with training is a new trend that many businesses apply and brings a lot of new, interesting, and effective outcomes.

To celebrate the occasion of International Women’s day at Van Thanh Tourist Park, CENTRAL provides our ladies a course “A power of Dress” the training topic was taken by Huynh Cao Yen Phuong (SAM Training Center).

CENTRAL’s ladies on International Women’s day at Van Thanh Tourist park

In this course, the guest speaker suggested our ladies should not pay huge money for fast trends. Instead, she recommended making extensive use of what they have in their wardrobe stylishly. The course lasted only 3 hours, it truly brings many values to our ladies with practice and application. I hope that with this new knowledge, our ladies can use it for their daily life.

The room’s perspective in “The Power of Dress”
Our ladies having a good time with the guest speaker

Behind every successful man, there is a woman. And behind all of CENTRAL’s success, there are always our ladies’ contributions – the beautiful roses coloring our gentlemen’s lives. Therefore, to honor our ladies, CENTRAL has held a celebration to recognize their contribution.

On behalf of BOD, Mr. Quang Duc Thong –Tender MEP Manager said: “Each of our ladies is beautiful, talented in every task, supporting us to handle many different tasks. One person has different roles, but you always try your best for the company. Not only me, but everybody can see it. I hope, between work duty and family duty as a mother, a wife, you always be, and forever good and talented.”

Mr. Quang Duc Thong giving his speech to our ladies at “CENTRAL ladies”

On this occasion, the CEO also gave his message to our ladies along with presents, wishes that always be beautiful, full of energy.

Mr. Quang Duc Thong giving flowers and gifts to ladies
Mrs. Mai Thi Kim Dung – head of accounting department giving flowers and gifts to ladies

This day has come to an end with a friendly and joyful atmosphere. I hope not only on this day, but a whole year, our ladies will be always beautiful, shining.

Some photos in the event:

Some Northern ladies receiving flowers and gifts
The happy moments at “CENTRAL ladies day”

COMMENCEMENT CEREMONY OF PHAT DAT BINH DUONG HIGH-CLASS APARTMENT PROJECT

After a long period of careful preparation, on the morning of February 26, 2020, Phat Dat Investor and CENTRAL held the commencement ceremony of the “Phat Dat Binh Duong High-end Apartment & Shopping Center” Project.

Located at the front of Highway 13, this is a very large-scale project next to Aeon Mall Binh Duong and Song Be Golf yard:

  • Land area: 3.73 hectares
  • GFA: 530,000 m2. Scale 3 Basements + 8 Building with 40 floors
  • Form: D&B General Contractor

The ceremony is honored to have the presence of:

  • From Phat Dat Investor:
    • Nguyen Van Dat – Chairman of the Board, CEO
    • Le Quang Phuc – Member of the Board of Directors
    • Pham Trong Hoa – Deputy General Director of Construction
    • Bui Quang Anh Vu – Deputy General Director of Investment
    • Dang Thuy Duong – Investment Director
    • Nguyen Khac Sinh – Director of Construction Management
    • Nguyen Quoc Bao – Deputy General Director of Danh Khoi Holdings Company
  • From CENTRAL:
    • Tran Quang Tuan – General Director.
    • Mai Chanh Thanh – Managing Director.
    • Yamato Watanabe – Senior Construction Manager.
    • Tran Minh Thi – Director of D&B Center
    • Cao Son Hung – Project Director
    • Luu Van Du – Commander in Chief

Together with Local Leaders, Partners, Subcontractors, and Vendors.

 Phat Dat BOD và CENTRAL doing the ritual of Commencement Ceremony
A memorable photo of Mr. Nguyen Van Dat together with Phat Dat BOD and CENTRAL

Mr. Nguyen Van Dat shared at the ceremony: “Mr. Tran Quang Tuan and I have been together for many years. That is why I chose CENTRAL as the D&B General Contractor for this project. Today, in the face of the thoughtful, decent, and solemn preparation of the ceremony, it is a great joy for the Investor, for those who will continue to accompany me in the upcoming days.

And on the occasion of the commencement, I also wish PHAT DAT, CENTRAL and all of us build this project with high quality, on schedule, everyone is at peace. Accordingly, business activities are effective. I want CENTRAL and all other partners to cooperate and build together. Priority is safety, followed by quality and progress. We are all committed to that”.

Mr. Nguyen Van Dat shared at the ceremony

Responding to the Investor’s trust and respect, CEO Tran Quang Tuan continued: “I am honored to be here to join all parties to organize the Commencement Ceremony of a very large-scale project and has a prime location on the main road connecting Binh Duong to Ho Chi Minh City. With the trust from the Investor, CENTRAL determines that it is necessary to make every effort to implement the responsibility of bringing the Project on schedule, achieving the highest quality and safety”.

CEO Tran Quang Tuan had a speech at the ceremony
Project overview at Commencement Ceremony

When the focus of the real estate market is on the suburb of Ho Chi Minh City, Binh Duong Shopping Center & Luxury Apartment is not only the perfect piece for local Economic – Infrastructure development but also the opportunities for sustainable profitability for Investors in the near future. Thereby, promoting development through facilities connecting infrastructure, the growth of industrial parks, entertainment centers, the increase of the young population, foreign experts, etc.

After the Commencement Ceremony, the SMB urgently implemented the construction of mass piles and the tunnel. The total progress of completing and handing over the Project is 26 months.

Further pictures of the ceremony:

Mr. Pham Trong Hoa – Phat Dat Deputy General Director, CEO Tran Quang Tuan had a memorable photo with SMB and partners
Overview of the Commencement Ceremony

THE TOPPING OUT CEREMONY OF 3BEES OFFICE BUILDING

On the morning of February 23th, 2020, at 281 Nguyen Van Troi street, Ward 10, Phu Nhuan District, HCMC, there is a topping ceremony of the 3Bees Office Building.

Perspectives of 3BEES Office Building

The project was completed 30 days earlier than planned.

  • As Site inspector – APEVE:
    • Mr. Le Hoang Viet – Project Director
    • Mr. Do Thanh Khiet – Site Inspector Manager
  • As CENTRAL:
    • Mr. Mai Chanh Thanh – Executive Director
    • Mr. Nguyen Duc Hau – Project Director
    • Mr. Le Nguyen Thanh Sang – Site Manager
Mr. Le Hoang Viet and BOD of CENTRAL in the ritual of offering incense

In this project, CENTRAL is a general contractor in structure, finishing, and MEP. After continuously building in 8 months, the investor is really pleased with the performance, especially they highly appreciate the consultation, risk solutions that have given and applied in building progress, this provides a great speed of better and higher quality for the project.

Real construction photo at 3BEES Office Building

3Bees Office Building is a construction within a city, so the work in the construction process should be ensured safety, parallel requirements of quality and progress must also be ensured. The construction time for handing over to the owner put into use is May 05/2020.

Somes photo of the ceremony:

Commemorative photograph between BOD & staff Apave
Commemorative photograph SMB

CENTRAL COMMENCEMENTED 2 TOWER BLOCKS COVE RESIDENCES (MU11) EMPIRE CITY PROJECT

On February 19th, 2020, Investor EMPIRE along with CENTRAL and CPE consultant held the commencement ceremony for 2 towers Cove Residences in the EMPIRE CITY project.

The ceremony honored and warmly welcome distinguished guests:

  • As Investor:
    • Mr. Vo Sy Nhan – Empire City General Director
    • Mr. Adris Bin Isnin – Deputy General Manager
    • Mr. Truong Vinh An – Site Director
    • Mr. Chang Yoke Choy – Site Director
  • As General Contractor CENTRAL
    • Mr. Tran Quang Tuan – General Director
    • Mr. Mai Chanh Thanh – Executive Director
    • Mr. Vu Duc Tai – Executive Director
    • Mr. Cao Son Hung – Project Director
    • Mr. Vo Quang Dat – Project Manager

With the presence of the customers are subcontractors, suppliers, construction teams, representatives of company departments, and the Project Executive Director members.

Mr. Vo Si Nhan, Mr. Tran Quang Tuan, and the Leaders performed an incense offering ceremony

Two towers of Cove Residences are located at the front of Sai Gon river. The tower material for these two is the top highest quality. Therefore, Cove Residences are considered as a “Precious Pearl” in the Empire City project.

Project perspective image Empire City

Project perspective image Empire City

Concerning choosing CENTRAL as the General Contractor, Mr. Vo Sy Nhan – General Director of Empire City shared: “This is the first project of the EMPIRE CITY Investor – Emperor City and CENTRAL. Cove Residences is one of the most important towers because it is considered one of the most luxurious apartments in Ho Chi Minh City.

In addition, Empire City has a convenient geographical location, which will help the construction work of Contractors, project partners, and suppliers take place consistently.

I believe that by negotiating on resolving problems, communicating directly via phone calls or meetings, we will find solutions to our all problems. Once again, I would like to emphasize that communication is the key to success. With communication, we can understand the situation and come up with a suitable solution. I hope this will be a milestone to develop a reliable relationship between EMPIRE CITY and CENTRAL, paving the way for future projects.”

General Director of Empire City – Vo Sy Nhan announced

In his speech, Mr. Tran Quang Tuan, representative of the CENTRAL contractor, thanked EMPIRE CITY Investor for the trust and appreciation, also determined that the contractor’s role and responsibility for the Project must be successfully completed.

CEO – Tran Quang Tuan announced

Some images from the construction:

Construction work at the site
Larsen piling work

Images from the Ceremony:

Empire City Labour Department, Supervision Consulting unit, and CENTRAL took souvenir photos
General Director of Empire City – Vo Sy Nhan along with CEO – Tran Quang Tuan
CENTRAL Labour Department and guests
Executive committee members of EMPIRE CITY Project – Stage 2

ALMA INVESTOR SEND THANK YOU LETTER TO CENTRAL

On November 21st, 2019, PARADISE BAY RESORT Co., Ltd Representative of Investor – Mr. Dor Lev-Ran – Construction Director sent a thank you letter to CENTRAL for the outstanding achievements in successfully completing the Project. Alma Resort put into handover stage to the developer on schedule with quality, aesthetics, and safety.

The original thank letter  from Mr. Dor Lev-Ran

Alma Resort is located at Bai Dai – one of the most beautiful beaches in Vietnam by Nha Trang Bay, Khanh Hoa. Alma is a luxury resort built on an area of 30 hectares. The scale of 200 villas and 2 towers including 400 luxury apartments with sea view, ALMA is capable of providing 31,000-holiday units including full facilities and entertainment complexes including restaurants, 12 swimming pools, and 200 swimming pools/ 200 villas, cinemas, concert centers, sports centers, water parks, …

 Alma resort November 2019

Alma resort has been recognized as a challenging project related to strict requirements in design and construction to ensure quality, aesthetics, comfort & environmental friendliness.

Pictures of amusement parks, restaurants, cinemas, water parks

Thereby, Investor is very pleased to express its thanks to CENTRAL Board of Directors, Project Management Board and a team of more than 100 Engineers, 2,000 workers who have continuously tried and worked hard for nearly 16 months to conquer the Project to a proud finish. In particular, CENTRAL completely satisfied Investor and world-class consulting units such as Turner from the US, Arcadis from the UK.

Mr. Dor Lev-Ran affirmed: “We appreciate and grateful for the efforts of the whole CENTRAL staff who had contributed greatly to the success of Project Alma today. CENTRAL deserves to be a leading construction contractor in Vietnam that we are always willing to recommend to any potential investor.”

CENTRAL DEPLOYMENT SUPERSTRUCTURE WORK 05 LE QUY DON, DISTRIC 3, HCMC

After completed a basement package, the project at 05 Le Quy Don, District 3, HCMC has a scale of 3 basements and 18 floors, CENTRAL has successfully finished it in 4 months, ahead of plan 1 month according to a contract schedule. The investor has appointed CENTRAL continuously to the body package.

Working to pour Concrete basement 3

This morning, February 10th, 2020, the investor – Ngoc Son Nam Investment Joint Stock Company (SSG group) along with CENTRAL has held the commencement ceremony for the superstructure.

Mr. Tran Duc Tam – D.CEO of Ngoc Son Nam Investment Joint Stock Company and BOD of CENTRAL in the ritual of offering incense

Located in a prime location in the center of the city, next to the Independence Palace, the street named Scientist Le Quy Don is today becoming the main street connecting District 3 and District 1. And this Building will contribute to change the face in this area.

Persprective of 05 Le Quy Don Building
General Contractor CENTRAL on Le Quy Don Street, District 3.

The building at 05 Le Quy Don is being built on an area of nearly 2000m2. CENTRAL as a structure contractor, finishing. The estimated time is 5 months.

The SSG Group is one of the largest real estate corporations in the country, with a series of names that are linked to Opal Tower, Saigon Pearl Plaza, the Pearl Plaza, Options, Options, Cape Pearl,